60-Day Pipeline ROW: 5,000 Mats, Zero Replacements.

Heavy Civil / Pipeline Construction · Gulf Coast region · Saturated, low-CBR subgrade

Big Bad Mats deployment
The Challenge
  • Right-of-way across saturated, low-CBR soil.
  • Prior composite mats cracked under tracked loads.
  • Recurring re-buys and disposal fees.
  • Weather delays on unstable ground.
The Deployment
  • 5,000 Big Bad Mats over 60 days.
  • Machine-set via telehandler — no crane.
  • Fast-connect locking, 2-person crews.
  • Relocated across multiple spreads.
The Outcome
  • Zero mat failures or replacements.
  • Non-porous surface — clean ROW handback.
  • Faster turns between spreads.
  • Reused on the next project intact.
Measured Results
$418K
Net savings vs prior mat spend
0
Mat replacements over the project
9 days
Mobilization time recovered
3.4 : 1
Benefit-to-cost ratio

"We stopped re-ordering mats mid-project. They held up, cleaned up, and moved to the next spread with us." — Project Superintendent (representative)